Cleaning and stripping works in a hotel in the area of Halkidiki.
-
Removals, removals in bungalows – Non-bearing structural elements
-
Removals, removals in the common areas (central building) – Non-bearing structural elements
-
Removal of parts of the load-bearing structure on first-floor terraces (inverted beams, existing slab, etc.) – pre-extension work
-
Complete or partial removal of load-bearing structural elements (pillars, etc.)
-
Removal of other structural elements (architectural overhangs, canopy, etc.)
-
Removal of existing room materials (gravel, thermal insulation materials, etc.)
-
Removal of existing roofs on a sloping concrete slab
-
Removal of existing pergolas in the surrounding area
-
UNINTERRUPTED cutting
-
Demolition of a section of a ground floor room including the roof on the face of this section.
-
Complete removal and removal of a room on the floor of a Bungalow
-
Demolition and removal of a four-bed roof (to form a roof)
-
Demolition and removal of sections of external staircases of bungalows
-
Demolition and removal of existing surrounding stone walls, including the bearing infrastructure
-
Removal of existing rocks
-
Removal and removal of existing outdoor pool showers
-
Removal of pitched roofs Lobby Main Building
-
See Breeze ceiling section removal
-
Demolition work in the rooms of the Bungalows and main building (removal of asphalt sheets, pumice concrete slopes, cement screeds)
-
Additional stripping works in the main building: cutting elevator walls, lobby, inverted Byblos beam, spa flooring