Phoenix Hotel
PHASE A
-
Remove junk items
-
Removal of laminate flooring in the rooms
-
Stripping carpets with the substrate in the corridors
-
Removal of internal frames
-
Removal of lobby - bar - restaurant
-
Removal of suspended ceilings
-
Removal of plasterboard linings
-
Removal of baths
-
Removing wardrobes
-
Computer stripping
-
Removal of offices - warehouses - common areas
PHASE B
-
Removal of all internal brick masonry throughout the building
-
Stripping floors with filling in basement, ground floor, roof, attic
-
Removal of roof and superstructure insulation
-
Removal of exterior brick masonry (balcony doors) on A', B', C', D' floors and roof
-
Removal of refrigerators with the ceiling, floor and dividing walls in the basement
-
Removal of WC in the basement (sanitary items, false ceilings, plaster walls, frames)
-
Removal of surface tiles around the entire basement
-
Removal of external frames throughout the building
-
Removal of ground floor glazing
-
Removal of metal pergola with false columns around the perimeter of the hotel
-
Removal of false ceilings on the ground floor using undisturbed cutting and stripping of their neurometal roof
-
Removal of built-in lamps in wardrobes
-
Removal of shaft ends
-
Removal using undisturbed cutting of decorative elements on exterior ceilings
-
Removal of room dividers on the balconies
-
Removal of staircase railings from the 1st to the 4th floor
-
Removal of balcony railings on A', B', C', D' floors
-
Removal of glazing from the 1st floor to the roof (98m2)
-
Removal of pool side beam and cantilever at ground floor level
-
Removal and breaking of slabs, cantilevers and beams of the mezzanine level of wing B' with undisturbed cutting
-
Removal of filling of floors of rooms on A', B', C', D' floors.
-
Removal of WC – swimming pool changing rooms
-
Stripping of coatings from columns, beams and internal masonry
-
Cleaning the basement kurangle
-
Exploratory work using machinery, at various points in the basement, as directed by the supervisor
-
Removal and breaking of mezzanine level slabs, cantilevers and beams
-
Removal of reinforced concrete construction elements
-
Excavations in earthy - semi-rocky soils, using mechanical means
-
Remove Headlights
-
Excavation of wall foundations
-
Removal of external masonry by YTONG
-
Widening of elevator shafts